Housing association refurb



The Government, through the Technology Strategy Board, allocated £17million to find innovative ways of reducing carbon emissions and provide exemplar energy efficient measures in the UK social housing sector. Sarsen Housing was awarded funding for the whole house refurbishment of an off-gas 1930’s three bed, semi-detached unoccupied house that had poor levels of energy efficiency, near Devizes, Wiltshire. The challenge was to turn the house into a highly energy efficient home. Sarsen Housing will be evaluated by the Energy Saving Trust for at least 2 years with the potential for lower cost implementation in volume across the remaining social housing stock.

Name of application: Stonepit Lane
Type of application: Refurbishment 1930s semi, 3 bed home
Property location: Devizes, Wiltshire
Heating and hot water options: Oil, gas, LPG, direct electric or heat pump
System installed: Daikin Altherma 6kW split heat pump + HB indoor
Connecting to: Underfloor heating, fan convector units and towel rails

Reason for selecting Daikin Altherma/Space Air: Space Air was selected to supply the Daikin Altherma system due to the innovative product, accessories and monitoring criteria that was needed. Space Air fulfilled it all.


Discussion Thread  

 


Related Categories

Clicking a category below will direct you to a list of related information

Skip Navigation Links.

Space Air Solutions Community



Related Items From Everyone


  1. The Space Air Daikin Altherma LT range of highly efficient heat pump systems are designed to...

    25 Apr 2014
  2. The Emirates Solar Industry Association (ESIA) are taking significant steps towards promoting...

    18 Apr 2012
  3. Pupils from Templewood School in Pentley Park, Welwyn Garden City recently spent the morning with...

    13 Dec 2011
  4. ITM Power (AIM: ITM), the energy storage and clean fuel company, notes the following with respect...

    17 Nov 2011
  5. Photon Energy installs Wind Turbine at Elephant & Castle. First of this scale - 6 kW.

    05 Nov 2008



Go To Home

Resource Links

We're social: View Available Feeds Find out more! Leave us your feedback

RSS



We appreciate all feedback. Please leave as much or as little as you like about any aspect of this website.

If your message requires a response, please leave your email address.