Everything News Jobs Opportunities Events Products/Services
more
 
About
Go to Home
Sign Up Sign in

Mitsubishi Electric Europe B.V.

Energy efficient future for tenants



The tenants of 42 warden-assisted flats owned by West Lancashire Borough Council, are looking forward to enjoying reliable, energy-efficient heating thanks to the installation of a number of Ecodan® air source heat pumps which provide them with low carbon, renewable energy.

In a move to increase the energy rating for the flats in Beechwood Court, Birkrig, Skelmersdale, the Council has replaced its old heating system which was run on a number of direct electric heaters connected to an 'Economy 7' circuit, with Mitsubishi Electric’s energy efficient, Ecodan system.

Following a review of the old system the Council called in accredited Ecodan installers, Dalliam Ltd, to advise on an energy-efficient, cost-effective, low carbon
replacement. Taking into account energy calculations from a survey of the building, Dalliam’s Managing Director, Bill Tyrer, and his team set about designing a new system.

“We know that people are often afraid to use their heating because of the cost, but these residents are vulnerable and need to keep warm when the weather conditions are poor. Our priority was to provide them with a reliable, effective heating and hot water system that was also affordable,” said Bill Tyrer, Managing Director of Dalliam Ltd. “The new system not only provides that, but has also lowered both the energy rating and the carbon emissions for the building, thereby fulfilling the Council’s brief.

One 5kW Ecodan unit was installed for every two flats, providing heat via a radiator circuit fitted with independent lockable heating stats and thermostatic radiator valves, further helping to save energy costs.

A 14kW Ecodan unit has also been installed to provide heating and domestic hot water to the warden’s accommodation and the communal dining area, and hot water for use in the kitchen, hair salon and guest rooms.

The replacement project has been carried out over several months and some of the units that were installed towards the end of last winter have already been given a thorough testing with the onset of bitterly cold weather, which saw temperatures dipping down as far -17ºC degrees. During this time, however, the tenants remained warm and cosy as the new system maintained a constant temperature of 24ºC degrees.

Councillor Val Hopley, portfolio holder for Landlord Services at West Lancashire Borough Council, said: “We are incredibly impressed by the Ecodan system. In fact, during the very severe weather last year, when we compared Beechwood Court with other Council buildings using gas boilers, it was the only one that did not fail in some way in its heating and hot water.”


Discussion Thread  

 


Related Categories

Clicking a category below will direct you to a list of related information

Skip Navigation Links.

Mitsubishi Electric Europe B.V. Community



Related Items From Everyone


  1. The key investors in the Middle East and North Africa will discuss the criteria for securing...

    04 Feb 2014
  2. A heat pump service and maintenance engineer is required to carry out service and maintenance of...

  3. BELECTRIC UK Organisations

    BELECTRIC are the world market leader in the design, development, financing,...

  4. HeatingSave Organisations

    Replacing your central heating clock with a HeatingSave controller can save...

  5. Top quality performance all-year-round Provide up to 70% of annual hot water requirements




Go To Home

Resource Links

We're social: View Available Feeds Find out more! Leave us your feedback

RSS



We appreciate all feedback. Please leave as much or as little as you like about any aspect of this website.

If your message requires a response, please leave your email address.