Powerstar at ISG Totty (construction)


INTRODUCTION
ISG Totty Construction – based in Bradford, England – is a heavy user of lighting and Information Technology equipment. The company identified the cost of electricity as a major concern and set out a project scope with Powerstar to find out if voltage optimisation could provide energy savings, but without compromising output.


THE CUSTOMER
ISG Totty is a main contractor that works across a comprehensive range of industry sectors through its public and private divisions. The business is one of the largest construction and property development groups in the North of England, carrying out new and refurbishment projects up to £10 million in value.

Clients include: Whitbread Plc; Persimmon Homes; City Lofts; Universities and Health Trusts; and a number of major institutional clients with interests in the North and Midlands. ISG Totty is part of the Interior Services Group Plc (ISG), a construction services specialist with an £800 million turnover.

In ISG’s sustainability policy, the business aims to progressively increase resource efficiency, to reduce dependence on non renewable resources and to reduce their carbon footprint.


THE CHALLENGE
The primary source of power at the ISG Totty building is for lighting and IT equipment, with the incoming power being supplied through a 100A per phase (three phase supply). Initially the voltage coming into the site was recorded, showing at 247V, with a minimum of 244V.
The Company was keen to identify energy consumption during weekday working hours and at weekends. The challenge was to see whether voltage optimisation could produce a reduction in the voltage and achieve the energy savings required for both time periods and with no adverse effect on performance.


THE SOLUTION
The Powerstar voltage optimisation system effectively reduces the incoming voltage into a building to more accurately meet the needs of equipment and machinery which is designed to operate at a lower voltage than that supplied. Stopping the excess voltage enables an organisation to reduce consumption and as a result lower electricity bills and CO2 emissions.

The initial surveys at ISG Totty identified that a 20V or 8.1% reduction in the incoming voltage would achieve a minimum saving of 16% and so a 125kVA Powerstar unit was installed.


THE BUSINESS BENEFITS
Following installation, Powerstar achieved the following results:

•Average weekday reduction in electricity consumption of 18.52%
•Average weekend reduction in electricity consumption of 20.06%
•A reduction in carbon dioxide of 36.47 tonnes of CO2 emissions.
The total amount saved by the business (based on 7p/kWh) is £5,938 and when the savings from the reduced Climate Change Levy (CCL) are added to the direct savings the total exceeds £6300, representing a 19.4% reduction in the total electricity consumption.


QUOTATION FROM CUSTOMER

“The Installation of the Powerstar systems has cut our energy cost by nearly 18%. This is a fundamental step towards our efforts to minimise our Carbon Footprint."

Phil Mason

Facilities Manager, ISG Totty


Discussion Thread  

 


Related Categories

Clicking a category below will direct you to a list of related information

Skip Navigation Links.

EMSc UK Ltd Community



Related Items From Everyone


  1. Display Energy Certificates Products & Services

    In March 2007, the UK government introduced legislation regulating the energy performance of...

  2. Home makes big savings following installation of wood pellet stove for space heating

  3. A new and exclusive funding scheme for businesses and public sector organisations

  4. see at www.inersysoman.com




Go To Home

Resource Links

We're social: View Available Feeds Find out more! Leave us your feedback

RSS



We appreciate all feedback. Please leave as much or as little as you like about any aspect of this website.

If your message requires a response, please leave your email address.