INTRODUCTION
Based in the West Midlands the National Metalforming Centre is the home to both the Confederation of British Metalforming together with a number of engineering bodies and is a conference venue. EMSc were charged with the task of helping to reduce energy consumption at the site through the Powerstar voltage optimisation system.


THE CUSTOMER
The National Metalforming Centre in West Bromwich in the Midlands prides itself on its smart, contemporary and friendly ambience. Its conference facilities and in-house catering service have attracted an impressive client list. The building is also home to the Confederation of British Metalforming – the leading trade association for UK manufacturers of fasteners, forgings and pressings.


THE CHALLENGE
During the test period the average daily electricity consumption at the National Metalforming Centre was running at 610kWh. Voltage levels were fluctuating between 240V and 255V. The challenge was to identify the level of voltage reduction and optimisation that could be achieved on the supply to the Centre and the resulting level of savings in electricity consumption.


THE SOLUTION
Powerstar provided the ideal solution. A voltage optimisation of 8% on the incoming supply achieved a reduction of 21% in electricity consumption and costs. The installation of one Powerstar unit enabled a reduction in the average daily electricity consumption from the previous 610kWh level to 500kWh.


THE BUSINESS BENEFITS
The 21% reduction in total electricity consumption provided the National Metalforming Centre with a cost saving of £3,000 per annum. In addition there are also savings in the maintenance and replacement costs to equipment on the site from matching the voltage more closely to the original design characteristics. The Centre has also reduced its carbon footprint by using less energy.


QUOTATION FROM CUSTOMER
“The purpose of this project was to reduce our energy consumption at the National Metal Forming Centre. This has been achieved with the installation of the Powerstar which has cut our energy costs by 21%.”


Discussion Thread  

 


Related Categories

Clicking a category below will direct you to a list of related information

Skip Navigation Links.

EMSc UK Ltd Community



Related Items From Everyone


  1. ICT companies and their customers will soon have common approaches and methodologies to calculate...

    09 Mar 2011
  2. Research into technologies designed to improve the efficiency of homes has received funding from...

    05 Mar 2009
  3. Energy saving products Products & Services

    Approximately only 3% of the total electricity used in the UK is generated from renewable...

  4. Energy efficient home improvements, such as the installation of a new condensing boiler, are...

    07 May 2008
  5. New developments built by the US federal government must achieve 30 per cent greater energy...

    28 Dec 2007



Go To Home

Resource Links

We're social: View Available Feeds Find out more! Leave us your feedback

RSS



We appreciate all feedback. Please leave as much or as little as you like about any aspect of this website.

If your message requires a response, please leave your email address.